Prefabricated Permanent and Temporary Structures for Stadiums, Sports and Cultural Events providing the highest level of quality with the benefit of short Installation times.

Types of structure 

  •  Type AAA      up to 30,000 Seated fans
  •  Type AA        up to 20,000 Seated Fans
  •  Type A           up to 15,000 Seated Fans
  •  Type Temporary / Removable Scaffolding substructure: up to 30,000 people – Can be relocated to a different site.

Installation Schedule  

  •       10-12 months 30,000 seats
  •        6-8   months 20,000 seats
  •        6     months 15,000 seats

Estimated Turn Key Prices: Please inquire.

Optionals

  • Support Building: Up to three Levels.

Hosting VIP Boxes, VIP lounge, Press Conference Rooms, Players and Referees Locker Rooms, Infirmary / Test room, PA Box, Catering Area, Storage, Team offices, Gym Warm-up rooms and More. Ideal for Community Center: During off game times. These Facilities can Concentrate Community & Social Activities, Classes, Psychological Health and Physical Rehabilitation. This Functional Turn Key Building includes air conditioning, electrical fixtures outlets and wiring, complete bathrooms and shower rooms, Telecommunications IT Network TV, wiring for phone system, USB backup, All sewage electrical and plumbing inside municipal line, hookup by client. Furniture by Client.

  • Lighting: FIFA approved Illumination + Generator
  • Field: Natural Synthetic Turf or Hybrid systems, Substitute and Referees Benches, Corner Flags
  • Field Radiant heating System Ideal for snow melting or cooling for heat
  • Running Tracks: Full Pour Polyurethane EPDM wear layer New & Resurfacing systems IOC approved

How it works:

  • Step 1: Client to Approve Estimated prices; Sign Planning and Feasibility study contract
  • Step 2: Planning and Feasibility Study a 4-6 weeks we charge a Flat Fee to be credited at Material Provision / Installation Contract.
  • This phase Includes: Pricing Confirmation, Site Survey, Project Design, Structural Calculations, Health, Safety, Egress and local code compliance and regulations adjustments, Sustainability Strategy, Transport and Installation Schedule Confirmation.
  • Step 3: Materials provision & Installation contract, credit Feasibility Study Fee credited back to client.This phase includes Purchasing, Production, Logistics and transport supervision, Project Management and Assembly